Project Introduction
China Railway Group: Guangzhou Metro Station Shafts
Build up Area: 23,000 sqm.
Structure Steel Fabrication+Structure Steel Installation and Installation
This project is a shaft shed project of Guangzhou Metro Line 13. In order to ensure safe and civilized construction and minimize the impact of construction on the surrounding environment, subway construction personnel use the shaft protective shed for fully enclosed construction. The protective shed of the shaft adopts a portal rigid frame structure. The subway shaft enclosure construction mainly has the following characteristics: first, dust reduction; Second, noise reduction; Third, reduce construction interference; Fourth, standardize management; Fifth, improve the construction image.The pictures below shows one of the shaft sheds.