Project Introduction
General Contracting: 6 Floors steel structure office building for Li Ying Investment Group
Built-up Area: 4,800 sqm.
Civil works, Structure Steel Fabrication+Installation and Installation
The project is 6 floors steel structure office buildings, with total build up area of 4800 sqm, located in Qingyuan, China. We (Union Construction Group) are the general contractor of the project: Union Steel Structure Mater Co., Ltd. fabricate and supply all the material include structure steel box columns, I beams, metal decking and claddings, etc.;and Union Green Engineering Construction Co., Ltd.take the civil work, structure steel Installation and metal cladding Installation, etc.
Guangdong Li Ying Investment Group (LYIG) is a professional manufacturer of concrete products in the fields of power, communication, railway, transportation, water conservancy, municipal administration, ocean, etc. Among them, power equipment and other products have become the largest supplier of China Southern Power Grid, communication products have become the largest supplier of the industry, and railway products have become one of the five railway suppliers in China.